9995 State Road 37 South
Mulberry, FL 33860
United States
Latitude: 27.7286
Longitude: -81.9897
Year Opened: 1996
Water Source: Lake
1994 PSD permit allowed construction of an Integrated Gasification Combined Cycle (IGCC) plant. The permit required a NOx BACT evaluation based on data gathered from the plant's operation to be submitted 12-18 months after operation began. On May 10, 2001, the permitting agency issued a proposed BACT determination to require SCR. Tampa Electric appealed the determination, and SCR was not required in final permit.
This plant was cancelled because of govenor Crist's push to reduce carbon emissions.
Unit 6, estimated at 1.5 billion.
EIA 2008
EPA 119 Proposed Coal Plants - 2003/2004
Sierra Club: Stopping the Coal Rush
Coal Swarm
EIA 2012 Form 860
EIA 2014 Form 860