63 Realty Road
Ashland, ME 04732
United States
Latitude: 46.63549
Longitude: -68.43744
Year Opened: 1993
Water Source: Big Machis River
ReEnergy plans to re-open it in Dec 2014.
The 2012 US Biomass Power Map shows the Boralex Ashland plant as idle.
Using a two-drum boiler with a traveling grate stoker, a combination particulate control system, and a hog fuel handling system with covered storage. The plant was built in 18 months for original project developer Alternative Energy Inc.
Installed capacity: 40MW, Average annual production: 240GWh
EIA 2008
2012 U.S. Biomass Power Map
EIA 2012 Form 860
EIA 2014 Form 860