Foot of Gum Street
Fernandina Beach, FL 32034
United States
Latitude: 30.6612
Longitude: -81.473
Year Opened: 1939
Water Source: Groundwater Wells
"We are now building a new turbine generator at the Fernandina Mill that is expected to be operational in June of 2012. This turbine generator, with an average capacity of 21 MW, will replace one of the two existing turbine generators. When the turbine generator is complete, the facility will produce all of the electricity needed for its operations onsite â and have surplus capacity to sell. "
EIA 2008
EPA Industrial Boilers
EIA 2012 Form 860
EIA 2014 Form 860