iLevel Weyerhaeuser
ExpandingOil-Fired Power Plant           
Thumbnail photo
Address

19586 County Road 102
Ironton, MN 56455
United States
Latitude: 46.43736
Longitude: -93.98564
Year Opened: 2010
Notes
This plant, fueled by bark and wood residuals, produces treated wood for lumber.

The major heat source for the processes at the facility is a 225 mmBtu/hr four-cell Wellons furnace. The furnace is fired by bark and wood residuals. Additional burners are being added to burn Landfill Gas (LFG). There is also a 40 mmBtu/hr back-up thermal oil heater at the facility.

This is a major amendment which allows for the construction and use of a pipeline from Crow Wing County Landfill to the facility in order to supply Landfill Gas to be used as an additional fuel for the dryers. This requires the addition of an additional burner in each Dust/Gas Burner to burn LFG only. The anticipated maximum supply of LFG is 16mmBtu/hr from the landfill.
Pollutants that will increase with LFG usage are SO2 and VOCs.
Edits
Take Action
Data Sources

Facebook Icon    Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.581959%0.6%1.0%1.1%
Asian0.3%0.5%
Black0.678952%0.7%0.5%0.7%
Hispanic1.4549%1.5%1.1%1.5%
White92.8225%92.8%93.9%92.3%
Population1,0311,0318,34461k
Income$75k$57k$57k
Visualize demographics on Justice Map
CORPORATIONS
NameRelationOwnership
WeyerhaeuserOwner 






To suggest a location change, you can drag the marker above.

View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuelSecondary Fuel(s)
Burner: Unknown TypeOperatingWood Waste Solids 225 Million Btu 
Burner: Unknown TypeOperatingNatural Gas 40 Million BtuWood Waste Solids
Burner: Unknown TypeOperatingNatural Gas 40 Million BtuWood Waste Solids
Burner: Unknown TypeOperatingOil 40 Million Btu 
Burner: Unknown TypeUnder ConstructionLandfill Gas 16 Million Btu 