Lima Wastewater Treatment Plant
Operating           
Thumbnail photo
Address

1200 Fort Amanda Rd
Lima, OH 45804
United States
Latitude: 40.72272
Longitude: -84.1316
Year Opened: 2010
Sewage Treatment Plant
Notes
First constructed in 1930, the Lima Wastewater Treatment Plant consisted of screening, grit removal, primary sedimentation, and anaerobic digestion. Throughout the years, secondary treatment, tertiary treatment and additional sludge digestion were added. In 1973, the plant was expanded to an average dry weather flow capacity of 18.5 million gallons per day (MGD) , and a peak flow capacity of 53.0 MGD. The design concept called for secondary and advanced treatment portions of the plant to operate at a peak rate of 33.0 MGD, with any remaining flow receiving primary settling and chlorination. Since 1973 the plant has provided primary, secondary and tertiary treatment, as well as biosolids recycling.
Edits
Take Action
Data Sources

Facebook Icon    Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.440529%0.5%0.4%0.3%0.2%
Asian1.67401%0.6%1.0%1.0%0.7%
Black2.99559%24.7%20.6%15.8%7.8%
Hispanic3.0837%4.1%3.8%3.4%2.7%
White85.9912%63.2%67.3%73.5%84.1%
Population1,13520k53k78k166k
Income$72k$51k$51k$56k
Visualize demographics on Justice Map




To suggest a location change, you can drag the marker above.

View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuelSecondary Fuel(s)Product
0.09 MWBurner: TurbineOperatingDigester Gas Sewage Sludge Contaminated Soil

More Details


COMMENTS
Log in to write a comment.