TLA/Alliance Incinerator
ClosedTrash Incinerator           
Thumbnail photo
Address

Smith Township, OH
United States
Latitude: 40.95734
Longitude: -81.05301
Cost (in millions): 250
Notes
Feb 2011: company withdrew the proposal and asked to have their state air pollution permit revoked; it was revoked on 2/28/2011

municipal solid waste (MSW) [50%] and construction and demolicion (C&D) waste [50%]
Joint Venture with TransLoad America
4,000 tpd/3,200 tpd refuse-derived fuel (RDF)

The plant, a project by Jefferson Renewable Energy, would bring in waste from a New Jersey landfill to the township. Once there, the waste will be sorted to remove recyclable metals and materials unfit for incineration. Then the selected waste will be incinerated to create approximately 65 megawatts of electricity a day -- enough to power 50,000 homes.

About 1.5 of those megawatts would run the plant. The rest of the power would be redirected to other areas using the township's power grid.

According to a May 2010 article (see links), this plant "remains in limbo" and their air permit, issued by Ohio EPA to Mahoning Renewable Energy in April 2009, is being appealed at the Environmental Review Appeals Commission. It also states that "the company also submitted a solid waste permit and were told additional details were needed, but haven't responded to that Ohio EPA request, preventing the application review to proceed."
Edits
Take Action
Data Sources

Facebook Icon    Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.2%0.2%0.1%0.1%0.3%
Asian0.1%0.1%0.3%0.4%0.7%
Black0.2%0.2%5.9%4.7%4.1%
Hispanic1.2%1.2%1.8%1.9%2.3%
White95.2%95.2%86.3%87.6%88.1%
Population1,3291,32913k49k333k
Income$52k$52k
Visualize demographics on Justice Map
CORPORATIONS
NameRelationOwnership
TransLoad AmericaDeveloper 
Jefferson Renewable Energy, LLCDeveloper 






To suggest a location change, you can drag the marker above.

View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuelSecondary Fuel(s)
90 MWBurner: Unknown TypeWithdrawnMunicipal Solid Waste 2000 Tons Per DayConstruction/Demolition Wood Waste

More Details


COMMENTS