Rowan Co Bd Of Education - High School
OperatingBiomass / Wood Incinerator           Total Power
0.15 MW
Thumbnail photo
Address

Viking Dr
Morehead, KY 40351
United States
Latitude: 38.2049
Longitude: -83.4794
Year Opened: 1982
Notes
"The school’s sawdust combustion unit was installed in 1982 by Energy Resource Systems of Minneapolis, Minnesota. In 2007, this same unit continues to generate enough energy to heat the 125,000-square-foot high school building and a nearby 60,000-square-foot vocational technical institute. The combustion unit, which burns nearly 756 tons of pure sawdust each year, is capable of generating a maximum energy output of 0.15 thermal megawatts (MW). One-third of the steam output produced by the unit is sold to Rowan Technical College to meet its utility needs at a cost comparable to using natural gas."
Edits
Take Action
Data Sources

NEI 2008
Facebook Icon    Twitter Icon
Environmental Justice Analysis
Distance (miles)02.551025
American Indian0.2%0.2%0.2%
Asian0.5%0.3%1.0%0.7%0.3%
Black1.0%2.7%2.4%1.7%0.9%
Hispanic2.4%2.3%2.7%2.2%1.6%
White93.9%91.8%90.6%92.1%94.5%
Population1,2592,81613k21k61k
Income$52k$42k$42k$43k
Visualize demographics on Justice Map




To suggest a location change, you can drag the marker above.

View Area in a Larger Map

More nearby facilities

Unit Information

PowerTypeStatusFuel
0.2 MWBurner: Unknown TypeOperatingWood Waste Solids 756 Tons Per Year

More Details


COMMENTS
Log in to write a comment.